The Everton board has been left stunned by an unexpected new blow.
Everton’s senior figures are shocked by the additional costs incurred in their stadium construction, which began in 2021 with a budget opproximately £550 millio
Everton’s senior team is shocked by the additional costs incurred in their stadium construction, which began in 2021 with a budget of around £550 million.
The Toffees are set to complete their 53,000-capacity stadium in late 2024, with the club aiming to host their first home game during the 2024/25 season. The stadium is being constructed by Laing O’Rourke, with fixed-price contracts in place to set minimum and maximum costs for labor and materials.